|
TOP TEN HIGHLIGHTS IN
YEAR 2004
1.
Presided by Kaifeng
Municipal Government and Kaifeng City Council, KFAS has made substantive strides
toward further renovation of state-owned enterprise. According to “Notions
upon Standardizing the Ownership Change of State-owned Enterprises” and
“Kaifeng National Property Rights Transferring Practices”, Guangdong Mingzhu
Group Co., Ltd and Shenzhen Jinxinan Investment Co., Ltd have accepted the whole
state property rights of KFAS’s, which means KFAS has changed from a
state-owned enterprise to a private stock enterprise. |
|
Total
Industrial Production Value & Sales Income Break RMB500M Yuan for the
First Time In
2004, by seizing opportunities, pooling wisdom & efforts of all the
employees and staffs, KFAS has completed an annual total industrial
production value of RMB526.06 Million Yuan, sales income of RMB554.5
Million Yuan, industrial incremental value of RMB145.5 Million Yuan and
profit & tax of RMB27.55 Million Yuan, which respectively increased by
31.1%, 10.8%, 25% and 86.8% compared to the same period last year. Thus,
KFAS has over-fulfilled the economic targets drawn by Kaifeng Municipal
Government. |
|
Main
Works of First Half Year of the Design Dept. It is to take the design of 52000m3/h air separation plant as key work, further to develop more new product; new technology; and to increase design quality and supply satisfactory service for our customers, in which including: to complete and standard main drawings of asp from 3200---15000m3/h to adapt market requirement; to lower cost and keep high quality level; to reinforce new comer’s training for design and check qualification for pressure vessel and pressure piping. |
|
Our
First Domestic Large ASP of 40000m3/h Successfully Put into
Operation in Shandong
The
first set of Large Nitrogenous Fertilizer Project---Shandong Hualu
Hengsheng Large Nitrogenous Fertilizer Modification Project has been
operated on Dec. 28, of 2004. It is key technology renovation project in
China during ‘Tenth Five Year Plan’ and it creates 10 items of the
first one in China including the first localization of 40000m3/h
ASP----developed and supplied by our company. |
|
Localization Time Is Coming for Large
Nitrogenous Fertilizer
According to newspaper ‘China Chemical’, a dream that has
lasted for more than 30 year of large nitrogenous fertilizer localization
becomes true at end of year 2004. The first set of demonstration project
built in Shandong Luhua Hengsheng Chemical Co. Ltd.has been successfully
put into operation, it trusts people that:
Localization Time Is Coming for Large Nitrogenous Fertilizer. |
|
The First set of large Nitrogenous Fertililer Localization Technology
Renoration Shandong on Dec.28: The first set of large Nitrogenous
Fertiliter Technology Renovation exampling project --- Shandong
Hualuhengsheng project ceremony of putting into operation is being hold.
it is key technology renovation project in China during "Tenth Five
Year plan" including 27 special subjects, realized a historical
breakthrough. |
|
The
First large Nitrogenous Fertiliter Localization unit put into operation |
|
Opening
Ceremony for waste-water treatment extension project |